Alec's Construction remodels bathrooms in Huntington Station (11746), working out of the yard in East Patchogue. A bathroom job here starts with what is behind the walls and under the floor — the drain lines, the venting, the subfloor and how the room gets rid of moisture — because those decide what the new room can be before anyone picks a tile.
Bathroom Remodeling in Huntington Station
Bathrooms in Huntington Station change as the streets rise south from the village up the moraine. Off New York Avenue and Pulaski Road the houses run from the 1920s to the 60s on small lots, and the older ones have the durable materials of their time: cast-iron drains, galvanized supply lines, small hexagon or square tile, and plaster walls. Those materials outlast many newer ones, but galvanized pipe narrows inside as it rusts and cast iron tends to crack along the bottom of horizontal runs, so a remodel is often the moment to replace them. On the newer streets toward Melville, the 1960s and 70s colonials and splits have upstairs hall baths and small primary baths with the expected wear: a soft subfloor at the toilet, loose tile around the tub, and fans venting into the attic. The ground is high and there is no tidal water, so the work is about age.
What We Look at First in Huntington Station
We start with the water pressure. Running the tub and the sink together tells us a lot about the supply lines, and weak flow in an older house usually points to galvanized pipe. Then we look at the drain from below, if there is a basement. Huntington Station files with the Town of Huntington at Town Hall on Main Street in Huntington.
Bigger Houses, More Bathrooms
The wooded hamlets have larger houses — colonials, splits and custom builds from the 1960s through the 1990s — and they usually have more than one bathroom: a hall bath, a primary bath and a powder room. The remodel is often the primary bath, and the questions are about space and plumbing rather than squeezing.
Second-floor bathrooms sit over finished rooms, so waterproofing matters twice: a failed shower pan stains the ceiling below. A bonded waterproofing membrane under the tile and a flood test before the tile goes down are the right standard.
Older primary baths from that era often have a large corner tub nobody uses and a small shower beside it. Removing the tub for a larger walk-in shower is the most common request. The fan, the circuit for heated floors, and the water heater's capacity for a bigger shower all get checked before the plan is final.

The Order of the Work
A bathroom goes wrong when finishes go over problems. So the order does not change: open it up, find what is wet or soft, fix the structure and the plumbing, then waterproof, then tile.
The shower is the part that matters most. Behind the tile goes cement board or a foam board system with a bonded membrane, sealed at every seam and corner, sloped to the drain, and flood-tested. The fan is sized to the room and vented outside, not into the attic. Tile, grout, the vanity, the toilet and the trim come last, and we test every fixture with you at the walkthrough.
Permits in Huntington Station
Huntington Station files with the Town of Huntington at Town Hall on Main Street in Huntington. A cosmetic refresh usually needs no permit, but moving plumbing, adding a bathroom, changing the layout or new electrical work is permitted work in Suffolk, and we file it before the walls are closed.
Alex walks the house in Huntington Station, photographs what he finds and gives you a written scope in the order the work has to happen — whether or not you hire us. Call (631) 312-7441 to set up a time.
Frequently Asked Questions
Our Huntington Station house is from the 1930s. Does the cast-iron drain need replacing?
Not always. Cast iron can last a very long time, but it tends to fail along the bottom of horizontal sections where water sits, and at old joints. With the bathroom floor open, we look at the pipe and, if needed, run a camera through it. Sections that are cracked or heavily scaled get replaced, often with plastic pipe tied into the sound cast iron. Replacing all of it is not always necessary.
How do you keep a new bathroom in Huntington Station from getting mildew?
With ventilation and waterproofing. The exhaust fan is sized to the room and ducted outdoors, ideally on a timer or humidity switch so it keeps running after the shower. Behind the tile, a bonded membrane keeps water out of the walls. Most mildew problems trace back to a weak fan or one vented into the attic.
Can you convert a tub to a walk-in shower in Huntington Station?
Yes, and it is the most common bathroom request we get. The tub comes out, the drain is moved to suit the shower, the walls are rebuilt with a waterproofing membrane, and the floor is sloped to the drain. A low curb or a curbless entry are both possible, depending on the floor structure.
Who issues the permit for bathroom remodeling work in Huntington Station?
Huntington Station files with the Town of Huntington at Town Hall on Main Street in Huntington. A cosmetic refresh usually needs no permit, but moving plumbing, adding a bathroom, changing the layout or new electrical work is permitted work in Suffolk, and we file it before the walls are closed.
Related Guides
- Bathroom Remodeling in Dix Hills, NY
- Bathroom Remodeling in Melville, NY
- Bathroom Remodeling on Long Island
- How Long a Bathroom Remodel Takes on Long Island
- Bathroom Remodel Questions, Answered
Work With Alec's Construction
This page is written by the crew that does the work. See Alec's Bathroom Remodeling service — layout, waterproofing and ventilation planned before the first tile. One crew from the first walkthrough to the last inspection.
Also in Huntington Station through the cold months: Kitchen Remodeling and Basement Finishing.
Also Serving Huntington Station
- Attic Insulation in Huntington Station — air sealing, baffles and R-49 depth
- Basement Finishing in Huntington Station — egress, ceiling height and moisture
- Fallen Tree Removal & Roof Repair in Huntington Station — tree off the house, roof supported and repaired
- Flood & Water Damage Cleanup in Huntington Station — wet material out, drying metered
- Gutter Installation in Huntington Station — seamless gutters, fascia and drainage
- Hurricane & Storm Damage Repair in Huntington Station — trees, flooding, cleanup and repairs
- Interior Painting in Huntington Station — the right work for the cold months
- Kitchen Remodeling in Huntington Station — cabinets, counters and layout
- Roofing in Huntington Station — tear-offs, repairs and storm damage
- Storm Debris Removal & Cleanup in Huntington Station — trees, building debris and hauling
- Storm Roof & Siding Repair in Huntington Station — wind damage, tarped and rebuilt
Talk to Alec's Construction About Bathroom Remodeling in Huntington Station
We come out, look at the house, photograph what we find and put a written scope in your hand. No pressure, no obligation. Working across Suffolk County since 2018.
Or call (631) 312-7441