A kitchen is the hardest room in the house to remodel well, because it is six trades stacked on top of each other in one small space. Demo, framing, electrical, plumbing, cabinetry, countertop template and tile all have to land in the right order, and one late trade pushes every one after it.
We run all of it with one licensed crew and one schedule. You get one contract, one point of contact, and a written completion date instead of five subcontractors blaming each other.

Custom cabinets take 6–10 weeks to arrive and that is usually what delays a kitchen, not the crew. We keep complete cabinet sets in our warehouse, so your kitchen can start this month instead of in the fall.
Most kitchen quotes hide the real number behind a “cabinet allowance.” Ours lists every cabinet, every square foot of counter and every fixture with its actual price, so the final invoice matches the estimate.
We build you a temporary kitchen before demo starts, contain dust with zip walls, and sweep every evening. Kitchens are the room people dread losing — we plan around that instead of ignoring it.



Find the one that sounds like your kitchen, then let us measure it. Every quote comes off a real walkthrough — laser measurements, the cabinets and counters you actually want, permits priced in — and lands in writing within 48 hours. Free, and no obligation.
Same layout, new everything you can see: cabinets, countertops, sink, faucet, backsplash and hardware. No plumbing moves, no permit in most townships. The right scope before selling, and for rentals. One to two weeks.
The most common Suffolk County scope. New cabinets and counters, updated electrical and recessed lighting, new flooring, appliance install, tile backsplash, and minor plumbing relocation. Three to five weeks on site.
Walls come down, an LVL header goes in, plumbing and gas move, and the kitchen opens to the dining or living room. Structural work, permits and inspections. Six to nine weeks, and the change that adds the most resale value.
Cabinets are 35–45% of a kitchen budget, so this is the decision that moves your number more than anything else. Stock ships in days, semi-custom takes 4–6 weeks, full custom takes 8–12. Countertops are the second lever — laminate, butcher block, quartz and natural stone are four very different jobs. We walk you through both on site and price the combination you actually pick. If your kitchen has to move fast, cabinets are the lever — see what we currently have in stock right now.
We measure, spec your cabinets and counters, price the permits, and send a written estimate — itemized, no hidden fees. The walkthrough is free and you are under no obligation to book.
Brand new, never installed, left over from cancelled and changed jobs. Priced well below retail because they are taking up warehouse space, not because there is anything wrong with them. Pickup or supplied-and-installed.
Doing the kitchen anyway? Bundling the bathroom saves a second mobilization and a second permit run.
Every accessory dwelling unit and in-law suite needs a kitchen. We build both under one contract.
Building new or adding on? We design and build kitchens from the framing up.
Book your free design consultation. We measure the room, walk through cabinet and counter options, and get you a line-item proposal — usually within 48 hours.
CALL DIRECT: (631) 312-7441
Real numbers, permits and timelines from our Long Island project experience.