RoofingCommercial RoofingSiding Decks & PatiosMasonry & PaversChimney RepairInsurance RestorationADUsKitchen RemodelingPaintingGuttersInsulationWindows & DoorsStorm DamageKitchen RemodelingPaintingGuttersInsulationWindows & DoorsStorm Damage
Get Free Quote
(631) 312-7441
sales@alecsconstruction.com
$800 OFF All Projects◆ Free Walkthrough — No Obligation◆ Licensed & Insured · 125+ Projects◆ ADU Grants Up To $125K◆ $800 OFF All Projects◆ Free Walkthrough — No Obligation◆ Licensed & Insured · 125+ Projects◆ ADU Grants Up To $125K◆
Kitchen Remodeling · Suffolk County

A Complete Kitchen.
Installed. From Stock.

Cabinets, quartz countertops, an island, a new sink and the plumbing — supplied and installed. The price comes in lower because the cabinet sets are already in our warehouse, paid for and waiting. Long Island showrooms quote more for the same kitchen and make you wait ten weeks for the boxes.

40.7712° N · 72.9934° W — SUFFOLK COUNTY

SERVICE: SUFFOLK & NASSAU COUNTY

LICENSED & INSURED

Kitchen Remodeling · Long Island

One Crew.
One Price.
Three Weeks.

A kitchen is the hardest room in the house to remodel well, because it is six trades stacked on top of each other in one small space. Demo, framing, electrical, plumbing, cabinetry, countertop template and tile all have to land in the right order, and one late trade pushes every one after it.

We run all of it with one licensed crew and one schedule. You get one contract, one point of contact, and a written completion date instead of five subcontractors blaming each other.

What's Included

  • Full gut renovations, demo to final trim
  • Cabinet supply and installation
  • Quartz, granite and butcher block countertops
  • Wall removal and structural headers
  • Electrical rough-in, outlets and recessed lighting
  • Plumbing relocation and fixture install
  • Backsplash tile and flooring
  • Permits pulled and inspections scheduled
Get Free Estimate
Kitchen remodeling Long Island — white shaker kitchen with quartz island
Why Choose Alec's

The Alec's
Difference

Cabinets In Stock, Not On Order

Custom cabinets take 6–10 weeks to arrive and that is usually what delays a kitchen, not the crew. We keep complete cabinet sets in our warehouse, so your kitchen can start this month instead of in the fall.

Line-Item Quotes, No Allowances

Most kitchen quotes hide the real number behind a “cabinet allowance.” Ours lists every cabinet, every square foot of counter and every fixture with its actual price, so the final invoice matches the estimate.

You Keep Living In The House

We build you a temporary kitchen before demo starts, contain dust with zip walls, and sweep every evening. Kitchens are the room people dread losing — we plan around that instead of ignoring it.

Our Work

Kitchen Remodeling Projects

White shaker kitchen remodel with quartz island

White Shaker Kitchen & Island

Suffolk County, NY
Open concept kitchen remodel with wall removed

Wall Removal & Open Concept

Long Island, NY
Two tone galley kitchen renovation

Two-Tone Galley Renovation

Long Island, NY
Execution Protocol

Our Process

How Every Kitchen Gets Built
PROTOCOL_REV: 2.4.0
ENV: SUFFOLK_KITCHEN
Step 01 // Design

Layout & Cabinet Plan

SITE_MEASURELASER
CABINET_PLANDRAWN
APPLIANCE_SPECSCONFIRMED
ESTIMATE_ETA48 HRS
Step 02 // Demo

Demo, Rough-In & Inspection

TEMP_KITCHENSET_UP
ELEC_PLUMBROUGHED
PERMITPULLED
HIDDEN_FEESZERO
Step 03 // Finish

Cabinets, Counters & Trim

CABINET_SETSHIMMED
COUNTER_TEMPLATEDAY_1
FINAL_WALKINCLUDED
WARRANTYWRITTEN
Scope & Cost Drivers

What Drives
Kitchen Cost In
Suffolk County.

Every kitchen is priced after a walkthrough. Labor here runs 20–35% above the national average, so national calculators will understate your kitchen. Three ways to do this, cheapest first:

Best Value · In Stock Now

Stocked Kitchen Package — Installed

A complete kitchen built around one of the cabinet sets already sitting in our warehouse. Because the cabinets are bought and paid for, this lands well under what the same kitchen costs through a showroom — and it starts this month instead of after a ten-week cabinet lead time.

Included
  • Complete cabinet set, delivered and hung
  • Quartz countertops, templated and installed
  • Island with quartz top
  • New sink and faucet
  • Plumbing connections and rough-in
  • Demo and haul-away of the old kitchen
  • Labor, materials and cleanup
Not Included — So You Know
  • Backsplash tile — quoted separately
  • Cabinet handles on most sets (some sets have them)
  • Appliances
  • Flooring
  • Moving walls, plumbing or gas lines

We list the exclusions up front because a surprise on the final invoice costs more than the tile ever would.

Book A Free Walkthrough See The Sets In Stock

Custom Kitchen Remodel

When the stocked sets do not fit your layout or your finish. Cabinets ordered to your spec, counters, new flooring, recessed lighting, tile backsplash and appliance install. Add 6–10 weeks for cabinet lead time, then 3–5 weeks on site.

Gut & Layout Change

Walls come down, an LVL header goes in, plumbing and gas move, and the kitchen opens to the dining or living room. Structural work, permits and inspections. Six to nine weeks — and the change that adds the most resale value.

Cabinets Only — Cash Price

Buying the boxes and hanging them yourself, or you already have a crew. Pickup from our East Patchogue yard, priced well under retail. Common for landlords and flippers — see what is in stock.

Why The Stocked Package Is Cheaper

Cabinets are 35–45% of any kitchen budget. Stock ships in days; semi-custom takes 4–6 weeks; full custom takes 8–12 weeks and costs the most per linear foot. Countertops are the next big swing — laminate, butcher block, quartz and natural stone sit at very different price points per square foot. Our stocked sets were bought for jobs that got cancelled or changed, so the cabinet line is already paid for. That single line is most of the difference.

Your number comes from a free walkthrough and a written, line-item estimate — usually within 48 hours. Book a free walkthrough or call (631) 312-7441.

In Stock Now

Complete Cabinet
Sets In Our Warehouse.

Brand new, never installed, left over from cancelled and changed jobs. Priced well below retail because they are taking up warehouse space, not because there is anything wrong with them. Pickup or supplied-and-installed.

See What's Available Call (631) 312-7441

Wondering whether your kitchen needs a permit? We break it down town by town — and if you are only replacing cabinets in the same layout, you likely need no permit at all.

Working out the budget? Kitchen remodel cost on Long Island walks the 2026 numbers, what a stocked-package kitchen gets you shows what our price covers line by line, and the cheapest honest way to redo a kitchen lists the five moves that actually reduce a kitchen bill.

Kitchen remodeling by town

Based in East Patchogue, working across Suffolk County. Grouped by which building department files the permit — that is the thing people get wrong.

Town of Brookhaven

Town of Islip

Town of Babylon

Town of Smithtown

Town of Huntington

Riverhead & Southampton

Own village building departmentconfirm village vs town for your address

Split between townswe confirm the department by address

Not Ready For A Full Remodel?

If the boxes are sound and the layout works, spraying the cabinets reads as a remodel from across the room for a fraction of the cost, in about a week. How cabinet spraying actually works, and which kitchens are genuinely worth it.

Common Questions

Kitchen Remodeling FAQ

It comes down to the cabinets, the layout and the counters. The lowest-cost route right now is a complete installed kitchen built around one of the cabinet sets already in our warehouse — cabinets, quartz counters, island, sink and plumbing. A custom kitchen with cabinets ordered to your spec costs more, and gut renovations that move walls or plumbing cost the most. Long Island labor runs 20–35% above the national average, so national calculators understate every scope. We price every kitchen after a free walkthrough and give you a written, line-item estimate, usually within 48 hours. Call (631) 312-7441 to book the walkthrough.
Two to three weeks on site for a stocked kitchen package, because the cabinets are already here. Three to five weeks for a custom kitchen once the cabinets arrive, and cabinets alone take 6–10 weeks to order. Gut renovations with layout changes run 6–9 weeks. Cabinet lead time is almost always what makes a kitchen slow, which is why using stock can pull a project forward by two months.
Yes, and most of our clients do. We set up a temporary kitchen space with your fridge, microwave and coffee maker before demo starts, contain dust with zip walls, and keep water shut off to a minimum. Plan on eating out or using a temporary setup for roughly three weeks.
If you are only replacing cabinets, counters and appliances in the same layout, usually no. The moment you move plumbing, add circuits, or take down a wall, you need a permit — the fee depends on the township and the scope. We pull the permit and schedule the inspections as part of the job.
Stock cabinets come in fixed sizes and ship in days. Semi-custom allows size and finish changes and takes 4–6 weeks. Custom is built to your exact dimensions, takes 8–12 weeks, and costs the most per linear foot. Cabinets are typically 35–45% of a kitchen budget, so this one decision moves the total more than anything else.
Both, and the installed package is where the value is. A complete stocked kitchen — cabinets, quartz counters, island, sink and plumbing — comes supplied and installed by one crew. If you would rather buy the boxes and hang them yourself, we sell the sets on their own for pickup at our East Patchogue yard. We also install cabinets a homeowner bought somewhere else.
Backsplash tile, appliances and flooring are quoted separately, and most of the stocked sets do not come with cabinet handles — a few do. Moving walls, plumbing or gas lines is also outside the package and pushes a kitchen into gut-renovation pricing. Everything else is in there: cabinets, quartz countertops, island, sink, plumbing connections, demo, haul-away and labor.
On Long Island, a midrange kitchen remodel typically returns 60–80% of its cost at resale, and a dated kitchen is the single most common reason a listing sits. If you are selling within a year, a cabinet and counter refresh usually returns more than a full remodel.
Yes — Smithtown, Patchogue, Sayville, Holbrook, Bellport, Islip, Huntington, Riverhead, Babylon and the surrounding towns, plus Nassau County projects. We are based in East Patchogue and one licensed crew runs your job from demo to final trim.
Related Services

More From
Alec's Construction

Bathroom

Bathroom Remodeling

Doing the kitchen anyway? Bundling the bathroom saves a second mobilization and a second permit run.

ADU

ADU Construction

Every accessory dwelling unit and in-law suite needs a kitchen. We build both under one contract.

Construction

New Construction

Building new or adding on? We design and build kitchens from the framing up.

Start Your Project

A Whole Kitchen,
Installed From Stock

Book your free design consultation. We measure the room, walk through cabinet and counter options, and get you a line-item proposal — usually within 48 hours.

CALL DIRECT: (631) 312-7441

NO SPAM · NO OBLIGATION · FREE ESTIMATE

Guides & Articles

Homeowner Guides

Real numbers, permits and timelines from our Long Island project experience.

Kitchen Remodel Cost on Long Island

Questions To Ask A Kitchen Contractor

Cabinet Sets In Stock — Clearance

Outdoor Kitchens on Long Island